Construction of side drain at Central Campus, Bawngkawn Brigade. History Club 16th September, 2022

  Objectives: To prevent waterlogging and flooding during heavy rainfall, ensuring the safety of students, faculty, and staff on campus. To protect the campus infrastructure, including buildings, roads, and walkways, from water damage and erosion. To improve the overall appearance of the campus by maintaining a clean and well-maintained environment with proper drainage. To create 

Read more